Apr 10, 2017

Northern Gas Pipeline construction packages

Northern Gas Pipeline construction packages

Multiple tenders are open for Jemena’s $800 million Northern Gas Pipeline (NGP) project.

Work packages include structural steel supply and fabrication, compressor station works and pipe supply.

Details below

Tender ID 476814
Title NORTHERN GAS PIPELINE, PREVIOUSLY (NEGI) – SKID FABRICATION AND ASSEMBLY
  Issue Date Close Date
  30 Mar 2017 11 Apr 2017
Tender To (Tendering Body) Jemena Northern Gas Pipeline Pty Ltd
Description NGP-ICN-E-150

Northern Gas Pipeline, Previously (NEGI) – Skid Fabrication and Assembly

Jemena is seeking a Contractor to provide detailed design, procurement, fabrication and delivery of six (6) gas process skids for Phillip Creek and Mt Isa facilities. The skids include, but are not limited to: fabricated base and support, piping, manual and actuated valves, vessels, instrumentation, cable and junction boxes.

Delivery schedule is:
• Skids required to be delivered to site by October 2017

For further information and for registration, please visit:  https://gateway.icn.org.au/project/3680/northern-gas-pipeline-previously-negi?st=projects&psid=1490827413

 

Tender ID 476815
Title NORTHERN GAS PIPELINE, PREVIOUSLY (NEGI) – STRUCTURAL STEEL SUPPLY AND FABRICATION
  Issue Date Close Date
  30 Mar 2017 11 Apr 2017
Tender To (Tendering Body) Jemena Northern Gas Pipeline Pty Ltd
Description NGP-ICN-E-151

Northern Gas Pipeline, Previously (NEGI) – Structural Steel Supply and Fabrication

Jemena is seeking a fabricator to provide design, procurement, fabrication and of structural steel for PCCS and MICS facilities.

The scope of works include, but not limited to:
* Supply of all materials
* Structural steel fabrication of typical items such as pipe supports, access platforms, equipment supports etc
* Non-destructive examination
* Hot dip galvanising

Delivery schedule is:
* Structural steel required to be delivered to site by September 2017

For further information and for registration, please visit:  https://gateway.icn.org.au/project/3680/northern-gas-pipeline-previously-negi?st=projects&psid=1490827413

 

Tender ID 476816
Title NORTHERN GAS PIPELINE, PREVIOUSLY (NEGI) – PIPE FABRICATION
  Issue Date Close Date
  30 Mar 2017 11 Apr 2017
Tender To (Tendering Body) Jemena Northern Gas Pipeline Pty Ltd
Description NGP-ICN-E-153

Northern Gas Pipeline, Previously (NEGI) – Pipe Fabrication

Jemena is seeking a contractor who can complete the fabrication of carbon steel, low temperature carbon steel and stainless steel pipe spools (c. 10,000 diameter inches):
a) Material receipt and inspection of free issued pipe and fittings
b) Qualification of welders and weld procedures
c) Fabrication of pipe spools in accordance with isometric drawings, Australian Standards and Jemena Specifications
d) 100% Material and Welding Traceability
e) Post Weld Heat Treatment as required by Jemena specifications
f) Inspection and testing (MPI / DPI, Radiography, Ultrasonic)
g) Surface treatment
h) Inspection Release
i) Packaging and delivery to site.

The indicative delivery schedule for the supply of fabricated steel is:
EOI Closing Date: 10 April 2017
RFT Issued to Short-listed Suppliers: Late April 2017
Contract Award: June 2017
Progressive Delivery commencing: Late August 2017, to be complete by late November 2017.

For further information and for registration, please visit:  https://gateway.icn.org.au/project/3680/northern-gas-pipeline-previously-negi?st=projects&psid=1490827413

 

Tender ID 476818
Title NORTHERN GAS PIPELINE, PREVIOUSLY (NEGI) – PILE SUPPLY AND DELIVERY
  Issue Date Close Date
  30 Mar 2017 11 Apr 2017
Tender To (Tendering Body) Jemena Northern Gas Pipeline Pty Ltd
Description NGP-ICN-E-152

Northern Gas Pipeline, Previously (NEGI) – Pile Supply and Delivery

Jemena is seeking a Contractor to supply approximately 900 driven steel piles for concrete foundations and pipe rack structural steel (piles to be free issued to construction contractor). The piles are to be delivered by the Vendor to PCCS and offloaded by others.

The approximate required on site date for pile materials is 15th July 2017.

For further information and for registration, please visit:  https://gateway.icn.org.au/project/3680/northern-gas-pipeline-previously-negi?st=projects&psid=1490827413

 

Tender ID 477352
Title NORTHERN GAS PIPELINE, PREVIOUSLY (NEGI) – MT ISA COMPRESSOR STATION CIVIL WORKS
  Issue Date Close Date
  04 Apr 2017 21 Apr 2017
Tender To (Tendering Body) Jemena Northern Gas Pipeline Pty Ltd
Description Number: NGP-ICN-S-169

Northern Gas Pipeline, Previously (NEGI) – Mt Isa Compressor Station Civil works

Jemena is seeking a contractor to provide procurement and construction services for the civil scope of the
MICS facilities.

The scope of works include, but not limited to:
• Supply of all materials (excluding earthing cable)
• Mobilisation to site (including set up of temporary facilities for the Contractors Personnel)
• Fabrication and installation of pre-cast and in-situ concrete supports (including excavation, backfill with select fill, restoration of hardstand as required)
• Installation of earthing and earth grid (including testing)
• Installation of buried conduit
• Installation and leak test of buried water service piping, including couplings for transition to copper
• Support services as required (e.g., survey, concrete testing, compaction testing)
• Removal of excess spoil to designated location
• Clean up and disposal of all waste
• Demobilisation

Target start date mid-July 2017

Closing: 21 April 2017

For further information and for registration, please visit: https://gateway.icn.org.au/project/3680/northern-gas-pipeline-previously-negi?st=projects&psid=1491261554

 

Tender ID 477353
Title NORTHERN GAS PIPELINE, PREVIOUSLY (NEGI) – MT ISA COMPRESSOR STATION SMPEI
  Issue Date Close Date
  04 Apr 2017 21 Apr 2017
Tender To (Tendering Body) Jemena Northern Gas Pipeline Pty Ltd
Description Number: NGP-ICN-S-176

Northern Gas Pipeline, Previously (NEGI) – Mt Isa Compressor Station SMPEI

Jemena is seeking expressions of interest for the construction of the Mt Isa Compressor Station facilities scope.

The site has the following characteristics:
• Greenfields construction scope;
• AS4041 Station Design;
• Approx. 20,000m2 existing hardstand area;
• 2 off compressor sets;
• 2 off aftercooler sets;
• Metering facilities;
• Gas quality measurement;
• Fuel gas regulation;
• Pressure regulation;
• Inlet filtration;
• Plant utilities
• Control Room/Switchroom;
• Amenities and workshop buildings; and
• Station pipework.

Commence construction October 2017

Closing: 21 April 2017

For further information and for registration, please visit: https://gateway.icn.org.au/project/3680/northern-gas-pipeline-previously-negi?st=projects&psid=1491261554